Whether you are doing home decoration or interior decoration, the quality of decoration is an important aspect. It is impossible to spend money to make yourself upset! Therefore, it is necessary to master some knowledge about the quality acceptance of decoration. Before entering
Whether the demolition and renovation project complies with the provisions of the contract, whether there are safety hazards, whether the wall treatment is clean, and whether the quantity, grade, and specifications of the incoming materials are consistent with the pre-agreed
Water and circuit
Second stage acceptance It should be a separate acceptance of waterway and circuit modification. Consumers should check whether all the modified lines are smooth, whether the layout is reasonable, whether the operation is standardized under the operation of professional plumbers or electricians, and re-confirm the actual size of the line modification. Only the lines After the modifications are completed, the putty workers can continue to seal the walls and putty
Dimensions of carpentry work
The third acceptance inspection should be done after the carpentry foundation is completed. At this time, the suspended ceiling and plaster lines in the room should also be constructed. After completion, the wall tiles in the kitchen and bathroom have been pasted. At the same time, the walls that need to be painted should be scraped with putty twice. The acceptance work at this stage is very important. Consumers should carefully check the drawings and confirm the size of each part. If any If there is any discrepancy, the construction team should be promptly reminded to correct it
Quality of woodworking work
After the veneer panels of all joinery products are pasted and the wooden lines are glued and nailed, consumers can proceed to the fourth stage of acceptance. This time is basically halfway through the construction period. The inspection at this stage should focus on the color difference and texture of the wood products, as well as the flatness of the large area and whether the gaps are uniform. After the product is completed, the oil worker can start the primer treatment. , at the same time, all floor tiles should also be pasted within this stage. This is the fifth stage in the phased acceptance
After completion
The acceptance content in the latter stage is the most comprehensive and thorough. Consumers It is necessary to check the installation of footboards, sanitary ware and hardware, whether the topcoat of wood products is in place, whether the paint on walls and ceilings is even, whether the panels and lamps installed by electricians are in appropriate positions, and whether the wiring connections are correct. In addition, consumers The construction team should be required to clean the room thoroughly before leaving the site
Decoration quality acceptance, don’t be careless